CHUALAR, Monterey County — October 29, 2026. Residents using Chualar Canyon Road have a county infrastructure plan that deserves separate attention from the resurfacing project on nearby Old Stage Road. Monterey County’s Chualar Canyon Road Bridge Replacements Project covers four bridges numbered 302, 303, 304 and 305 along the rural canyon road. The environmental study was circulated in February 2024.

Where are the four bridges?

According to the state filing, the crossings are approximately 1.8, 2.1, 2.7 and 2.8 miles east of the junction of Chualar Canyon Road and Old Stage Road. They are small, single-span structures, each roughly 15 feet long. County engineering documents say the original construction dates are unclear, but the structures were modified in the 1940s.

Why replace them?

Planning and inspection records raised concerns about capacity for heavy emergency vehicles. The project evaluated replacement with reinforced concrete box culverts, single-span slab bridges or a prefabricated arch system. The plan also addresses environmental protection near Chualar Creek, including erosion controls and temporary traffic detours during construction.

Has the project been completed?

The 2024 environmental record does not establish completion by October 2026. It documents a proposed project and environmental review, not the latest award, closure or inspection status. Motorists should ask Monterey County Public Works for the current construction schedule before relying on an old detour description.

How is this different from Old Stage Road work?

The Old Stage Road reconstruction involves an existing roadway from Iverson Road to Chualar Canyon Road. The bridge-replacement plan concerns four separate structures farther along Chualar Canyon Road. They may affect overlapping drivers, but the two projects have different engineering scopes and source documents.

Primary source: California State Clearinghouse SCH 2024020662, Chualar Canyon Road Bridge Replacements Project, received February 16, 2024. This is an explanatory report on the documented plan, not an announcement of a new October construction start.

YOUR LOCAL NEWSPAPER NEEDS YOU

Help this community newspaper grow

Your support helps build coverage for the people and places this local newspaper serves.

Donate once by card ↗
Help Chualar News grow Help strengthen reporting on Chualar: community voices, important decisions and local life.
Support Chualar News

Choose how to support Chualar News:

Credit / Debit Card via Stripe

Choose an amount from $1. One-time support through the publisher's LINKERNO Stripe account.

Continue with PayPal Continue with Zelle

Zelle payments go to Vitaly Ataev Troshin. Please verify the recipient in your bank before sending. Availability depends on your bank.

Optional reader support. When possible, add “Chualar News” to the payment note. Contributions are not advertised as tax-deductible. Support does not influence editorial decisions.
Optional support through the publisher. Contributions are not advertised as tax-deductible and never buy editorial influence.

Chualar News — Your Community Newspaper

Have a correction, news tip, local announcement, or story to submit? Contact our editorial team. All submissions are reviewed before publication.

Contact the Chualar News newsroom →

More from Chualar News

Visit Chualar News →

COMMUNITY

Comments

Join the California58 conversation. You must be signed in to comment.